Elmec MEP was awarded the CAT B fit out of level 23 of The Shard.

This is highest office floor of the building and required a high standard or workmanship, planning and sequencing. Elmec MEP installed all FCU’s, T-Points and distribution pipework to the floor.

Elmec MEP were instructed to work on the mission critical environment of Great Ormand Street Hospital. Carrying out the project in a live environment whilst working under strict COVID-19 government guidelines and wearing full PPE.

The works included a full reconfiguration of pipework along the roof and replacement of 2 No. chillers.

Elmep MEP were appointed to work in collaboration on the Tottenham Hotspur FC Training Ground.

The new hotel facility included renewable energy systems including harvested rain water units connecting to a new Ground Source Heat Pump.

Working to a tight deadline Elmep MEP were able to deliver on time and on budget.

Elmec MEP were successfully appointed for the CAT A fit out of 110 High Holburn.

The installation was to the highest of standards and included the toilet core, mechanical ventilation, pipework, lagging and heating system.