Elmec MEP were successfully appointed for the CAT A fit out of 110 High Holburn.

The installation was to the highest of standards and included the toilet core, mechanical ventilation, pipework, lagging and heating system.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

The project

• CAT A Fit Out
• Fan Coil Units
• Associated Small Power
• Distribution


Project Length

6 months