Elmec MEP was awarded the CAT B fit out of level 23 of The Shard.
This is highest office floor of the building and required a high standard or workmanship, planning and sequencing. Elmec MEP installed all FCU’s, T-Points and distribution pipework to the floor.
Leave a Reply
Want to join the discussion?Feel free to contribute!