Elmec MEP was awarded the CAT B fit out of level 23 of The Shard.

This is highest office floor of the building and required a high standard or workmanship, planning and sequencing. Elmec MEP installed all FCU’s, T-Points and distribution pipework to the floor.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

The project

• LTHW Pipework
• T – Points
• Distribution
• Small Power


Project Length

3 months