Entries by

The Shard

Elmec MEP was awarded the CAT B fit out of level 23 of The Shard. This is highest office floor of the building and required a high standard or workmanship, planning and sequencing. Elmec MEP installed all FCU’s, T-Points and distribution pipework to the floor.

Great Ormond Street Hospital

Elmec MEP were instructed to work on the mission critical environment of Great Ormand Street Hospital. Carrying out the project in a live environment whilst working under strict COVID-19 government guidelines and wearing full PPE. The works included a full reconfiguration of pipework along the roof and replacement of 2 No. chillers.

THFC training facility

Elmep MEP were appointed to work in collaboration on the Tottenham Hotspur FC Training Ground. The new hotel facility included renewable energy systems including harvested rain water units connecting to a new Ground Source Heat Pump. Working to a tight deadline Elmep MEP were able to deliver on time and on budget.

110 High Holborn

Elmec MEP were successfully appointed for the CAT A fit out of 110 High Holburn. The installation was to the highest of standards and included the toilet core, mechanical ventilation, pipework, lagging and heating system.